Switching the lines to the new exchange - Changement des lignes au nouveau NRA.

My house is now 797 meters from the DSLAM instead of 4,500. Sam pointed out in a recent blog comment that France Telecom has the new exchange up and running and that Free's DSLAM would be installed soon. I saw it today.

StNom-ADSL-LineTest-June2009

Now if only my line weren't dead so I could enjoy it.

My DSL connection went down yesterday at noon and has been out for 36 hours. My DSL provider (Free) is actually very stable but the line speeds have been very slow. My cable connection with Numericable is just the opposite - fast when it works but out of order more than 50% of the time.

If DSL goes down it's because they are doing something at the exchange. Any problem in the past I've had has been an inadvertent disconnection by FT. I knew something was up when my neighbor across the street came by with his Freebox to test it on my line because his line was down too.

I waited for my cable connection to come back up and then quickly hopped online to check the details of my line. What I found was great news. My line has been shortened by connecting to the new exchange. The bad news is something is wrong with the connection.

Then today I was driving home and saw the large France Telecom manhole at the edge of the village open with workers inside. My son and I walked down and talked to the workers, taking a few pictures of the manholes.

Manhole work to redirect copper lines
The workers were really helpful and let us snag a few pictures of them at work in the underground chamber. I was surprised by how large it actually was.

View down inside manhole   View inside manhole

The next person I encountered we knee-deep in water in a second manhole working to reconnect some of the thousands of lines which have to be rerouted.

Patching copper lines down to the new NRA

Then I walked the rest of the 797 metres and arrived in front of the actually exchange, which they call a NRA(HD). The France Telecom person there was very helpful and answered my questions about the fibre routing and how the exchange was upgraded. Simple telephone lines are still connected to the old exchange but any DSL lines in our village now terminate in the new village exchange.

I was able to snap a few pictures of the exchange with the door open from the fence. You can see the patch panels on the right but the DSLAM's aren't visible in the shot. They are on the left (Free and Neuf).

St Nom La Breteche NRA (S3N78) for DSL   St Nom La Breteche NRA

Interior of St Nom La Breteche NRA (S3N78) for broadband

I was finally able to get through to Free to tell them my line was down. The earliest they will send a technician is in 7 days. That's a long time to go without our fixed line...

Sunday, October 5, 2008

Planning a new exchange / La planification pour un nouveau commutateur

As I mentioned in my earlier posts, one of the key items in our village may be the design of the new telecommunications exchange they are building next year. I wrote to some Dutch friends (fiber experts) asking for their advice on a number of key questions.

Here is my attempt to paraphrase their answers:

  1. Question:
    Would it be better to build a separate exchange for fiber next to the copper exchange or to put the ODF in the same physical building?

    Answer:
    It is extremely important that the incumbent operator can't "hold anyone hostage" if fiber is going to terminate in the same building as copper. There are a number of points to consider in such a case:

    • There needs to be a room which is separate from the main DSL equipment and that is accessible from the outside for the ODF and fiber interconnection. This room needs to be large enough to accommodate operator's active equipment if necessary.

    • The municipality needs to have the key and control access rights to this room.

    • There needs to be a conduit from the room to the perimeter of the land owned by the incumbent and this needs to be large enough to accommodate all the fiber coming in (see size questions below).

    • There needs to be a separate power supply from France Telecom - essentially a second meter for the municipality to the room.

    • The room needs to be large enough to house a UPS and air conditioning if necessary.

    • There needs to be a hole in the wall between the fiber room and the ISP's equipment which is large enough to pass 3000+ fibers (1500 households x 2 + some spare)

  2. Question:
    How much space in the building/room is necessary to house an ODF?

    Answer:
    One ODF will support 800 fibers and it measures roughly 1 meter x 50 cm, including space for patch cords. You need to be able to access the ODF from the front and the back.

    One 19 inch rack will support the electronics for roughly 400 users, dissipating 3-5 watts per user. The rack needs to be accessible from the front side.

  3. Question:
    In planning for conduit access, how many fibers should we plan on for each home?

    Answer:
    There is no need for more than 2 fibers per residence. The trend is actually moving to one fiber per residence with three colors per fiber (data upload, data download and television). Putting in two fibers at the same time is a good way to hedge your bets though.

  4. Question:
    How much space will we need inside existing conduit to push out point-to-point fiber from the exchange point to the village?

    Answer:
    One of the projects in the Netherlands uses cables with 96 fibers inside. They can bunch 6 of these cables (6 x 96 = 576 fibers) into one 50 mm HDPE duct. It would take 6 of these 50 mm ducts to provide 2 point-to-point fiber connections to each of the 1500 households in the village, with a little to spare.

    Using these numbers, the space we'd need for the conduit leaving the exchange (before disaggregation) would be 100 mm x 300 mm.


As always, I'm grateful to my Dutch friends for their advice.

Thursday, October 2, 2008

Working together with the municipal government / Collaboration avec le gouvernement municipal

The meeting today with Bruno DIDIER and Philippe CHIVOT (les maires-adjoints) from the municipal government went extremely well. We spent almost 2 hours talking about the status of broadband development in the village and the best ways to move forward with a fiber project.

There were a number of key issues and developments:

  • The new, upgraded exchange is due to be built early next year

    This is a huge development and is tied to a EUR 50'000 investment by the municipality. The deal is rather complex as I understand it. France Telecom owns the land where the exchange will be built but our local government will pay for the construction of the new building/shelter. After 20 years the building will be deeded back to France Telecom.

    I was never very happy with this arrangement but luckily the papers have not been officially signed and approved. This is excellent news. One of the key points of our discussion in the meeting was how to restructure elements of the deal to accommodate fiber rollouts.

  • Competitive operators likely are coming

    The new exchange will be built to accommodate competitive operators and from the look of it there are some who may be interested in coming with their own equipment. Obviously there are no "done deals" yet but this would be a good sign if it turns out to be correct.

    Operators would install their own DSLAMs for DSL (and hopefully FTTH equipment at the same time) when the exchange opens. For the residents in my area that means DSL speeds at 400 meters, instead of 4500 meters. Others farther up and away from the exchange won't be so lucky but there is a bit of geography in our favor as well. Generally the farther you get from our exchange the more expensive the homes become. That means the most expensive lines would be installed to the most expensive houses where residents could pay more for the installation. All operators already have a fiber presence which passes through the exchange using the Yvelines Numériques backbone.

  • We are all islands (private residences)

    It turns out that St Nom La Bretèche is different than many other French towns because we are largely made up of islands of private residences (where the roads are owned and maintained by the residents). This set-up actually makes rolling out fiber easier because the conduit in each of these private residences belongs to the residents, not France Telecom. The challenge is linking these various islands together by crossing streets or through France Telecom's conduit - and then back down to the exchange.

    We talked about ways to facilitate "bridges" (conduit) between these islands (subdivisions) and the municipal government seems very ready to help. I asked for a list of any proposed work on roads ahead of time so that we could put in manholes and conduit across streets between these "islands" whenever there was work planned.

    The really good thing about the island approach is that each private residence will only have to build out to the nearest "fibered" island and not all the way back to the exchange. it will take some planning to ensure we have enough fibers passing through each residence to ensure point-to-point connections back to the exchange but it is possible.

  • Ensuring the new exchange is "fiber-ready" and open to competition

    As long as the village is going to be footing the bill to build the exchange for France Telecom why not insist on including space for an optical distribution frame which becomes the property of the village? That is one of the nice things about the government paying EUR 50'000 to build something for a private company. They have bargaining leverage. If France Telecom were against the idea the municipality could simply take the 50'000 and build their own public fiber exchange right next to the copper one instead.

    We spent some time talking about the details of what the municipality should require in the deal and I promised to get some feedback from experts in the Netherlands. I'll post their responses.

I left the meeting very excited for the project. The next step is contacting the competitive operators (with the help of the municipality) about putting a workable fiber plan into action.

Sunday, September 21, 2008

Two steps behind - Deux pas derrière

Talk about missed opportunities. This is the residence just next to ours which dug up their sidewalks this week - without putting in any new fiber or conduit. It is really too bad we are not better coordinated in our village because this is one of the next two residences I wanted to target for expansion of our own network.

Neighboring residence - sidewalk work without fibre

They do have existing conduit which we could probably use but this would have been an opportune time to put in a telecommunication chamber (hand hold) as well.

I'm going to try and schedule a meeting with the mayor soon so we can get an idea when these projects are going on.

Tuesday, September 16, 2008

One step behind - Un pas derrière

I walked past the spot of my preferred aggregation point this morning on the way to work and saw workers getting ready to redo the surface of the parking area. It's too bad I didn't know about it because it would have been an excellent time to drop in the box.
Repaving - without our box

It's not too bad though because I still don't know who owns that particular parking spot I wanted to use and whether they would have let me put the box there. Also, I started wondering how I would be able to tap into France Telecom's box which was in the middle of the public street. It may be better for me to simply move one "hop" back onto onto the communal property and put the box there.

Still, it highlights one of the difficulties of planning a network like this. It is difficult to coordinate work.

Sunday, September 14, 2008

Perfect aggregation point? Or not. - Un point d'agrégation parfait? Ou pas.

I probably made a number of neighbors nervous yesterday walking around with my map and GPS in hand trying to locate hand holes in their property from the sidewalk. However, the exercise helped me decide on the area were I think it would be best to place the aggregation point. I found it at the bottom of the residence, right next to the small shops and across the street from the France Telecom trunk conduit.

Pacificinterco.com-ODFI initially looked for a place to install an ODF because it allows faster access to the connections and seems to be easier to add connections if we expand outside our residence. I was interested in an ODF from Pacific Interconnections, LLC in the US (see photo). However, I quickly realized I'd take a big risk putting an outdoor ODF in an area of the residence which has lots of delivery trucks.

I'm probably more sensitive to trucks backing up in the residence because we came home from vacation this year and someone had backed into our car parked on the street. The paint from the vehicule that hit us was green and high up on the car - leaving the police to assume it was a rather large truck. The damage to our car was expensive to fix but nothing like trying to repair a damaged ODF. That's why I think it may be better to have a splice enclosure in a hand hole in the street.

As I mentioned in my last post, I think the best place would be next to hand hole 021 on my distance map. I took pictures of the spot this weekend (see below).

Possible aggregation point - in parking by silver car The road with the existing France Telecom boxes (shown to the left) belongs to the village, not our residence. That means it would be much more complicated to get permission to dig and install our own boxes. However, the land with the cars parked on it is part of the residence. This parking area is in fairly desperate need of a renovation and would be an excellent spot to pass off the residence connections into France Telecom's own conduit. Possible hand hole spot, on left in front of silver car

The nice thing about the hand hole in the two pictures is that it's one "hop" away from the main conduit which goes down 330 meters to the exchange. I would like to put our hand hole in front of the silver parked car in the picture.

The only catch is the parking spots are actually owned by individual tenants in the residence, not communally. That means I'd need to get permission of the owner to put in the box. I'm not quite sure how or if that would work.

The residence DOES own the road in front of the white garages (in the middle-left picture) if the parking spot doesn't work out. There are two FT hand holes there as well which could provide easy access. In that case I'd look at putting the hand hole next to waypoint number 020.

Finally, I inserted another waypoint out at the exchange to do the calculations for Part 2 of the project, going from the residence to the exchange (see below).

Distance calculations - residence to the exchange

Saturday, September 13, 2008

Topology and layout ideas / Idées pour la topologie

I had lunch with Vincent MONVILLE again this week and we talked about some of the fiber details of the project. I was interested in his estimate of installation costs (to see if I've set aside enough) but he explained that first I had to decide exactly how I was going to distribute and split off each connection. Only then would it be possible to get a better grasp on the prices.

He was right so I took out my trusty Garmin GPS III Plus and marked all the handholes specified in the France Telecom map. That allowed me to get a pretty good estimate of the distances from each handhole back to the main aggregation point for telephone lines in our residence.

Handhole distance from aggregation point

Here are the numbers I came out with.

  • Total length of all fiber pair segments to the handhole (handhole to aggregation point): 3934 meters
  • Total length of all fiber pair segments to the house (generous estimate of home/apt to aggregation point): 4719 meters
  • Average loop length to handhole: 79 meters
  • Longest loop length to handhole: 220 meters
  • Shortest loop length to handhole: 19 meters

  • Best aggregation point: In the street next to waypoint #021
Distance from each house to aggregation point

I figure the best way to distribute the 50 lines is using some sort of microconduit within the existing conduit in the street. That way the line would be protected at the split-off points. I'm not sure though so any suggestions would be greatly appreciated.

Saturday, August 23, 2008

France Telecom: map of the conduit - France Telecom: Carte des fourreaux

Conduit Map (St Nom) I came back from the US this month and my neighbor had a big surprise waiting for me. He had called France Telecom to get more information about the conduit in the residence and to request a map.

He presented it to me at the door the day I got back. It's great. Now I can see where I need to put my own aggregation point (bottom right of the communal property) in order to get back to the exchange in the most efficient way.

There is, however, still some confusion over who actually owns the conduit. My neighbor was able to dig up some information from the original builder but it is information already had (Article 14: Passage de Canalisations). It is fairly clear that even if we don't own it we have a right to have the communal antenna (RF over fiber on the second pair) in the conduit.

He gave me the name of his contact at France Telecom and I'll follow up with him this week.

Friday, June 13, 2008

Residents association meeting 2008 - La réunion de l’association 2008

Last night was the resident association meeting and it went well. As always, there were some crazy, heated moments but there seems to be a new consensus that everyone will pay to redo the roads and sidewalks. Part of the impetus is that the value added tax in France on these projects is 5.5% now but will jump up to 19.8% after next year. That means we would had to pay more for the same work after that.

The road work comes out to be EUR 3200 (USD 4800) per house and less for the apartments. It makes the additional cost of a fibre rollout at the same time seem pretty small. At one point the engineer was explaining how they would dig the road and re-install the electrical conduit in the roads to reach the lamp posts. One of the older residents raised her hand and asked where the fibre optic conduit was going to be put! I was thrilled because she was looking forward to it.

I spoke up and explained that we will likely use the existing conduit but may need to cross streets with new conduit in certain places. That can be done at the same time they are doing the road work. I have very little time left (only 2-3 months) to get things ready before we vote officially on the road work. I need to have a proposal ready for them before the vote and I'm translating a handout right now which I'll pass out to all homes in the next week or two. I'll post the handout shortly.

Monday, March 3, 2008

Conduit photos - Photos des fourreux

Concrete box / garage This photos shows one of the original concrete boxes in front of the garage of a house in the residence. This photo gives a good idea of the distance between the box and the house. The conduit typically runs between the box in the driveway and the floor of the garage.
Inside concrete topped box - not clean This box has a concrete top and has not been cleaned. It has many more cables than the other concrete boxes I've seen because it takes one aggregated cable and splits it out into six different phone lines. The orange conduit at the top of the screen takes the large (thick) white cable out to the telecom cabinet on the street. This cabinet then splits it out to individual lines which come back through the same orange conduit and head out to individual homes.
Metal France Telecom cover on box / garage The box shown in this photo had a new cover put on last year by France Telecom. It is closer to the home than most other boxes in the residence.
Inside metal topped FT box - clean This box was cleaned out in 2007. The large conduit going from left to right runs parallel to the street and connects box to box. The small 40mm conduit at the top runs between the box and the home. The light cords are telephone and the dark black cords are the old coax cables from a common antenna.

Sunday, March 2, 2008

Rules regarding conduit in our residence - (Article 14: Passage de Canalisations)

Today my neighbor passed on something he found that talks about conduit in the terms of our resident association. I was also able to locate it again in the papers we received from the notary when we bought our house.

The document is called the "Cahier des Charges du Lotissement et Association Syndicale" in French and my copy is dated 14 October 1970. Article 14 deals with the conduit in the residence.

Article 14: Passage de Canalisations

Les propriétaires de chaque lot seront tenus, sans indemnité, ni pouvoir s’y opposer, laisser passer dans leur sol ou sur leur lot, tous conduits nécessaires ou utiles a l’un quelconque des autres propriétaires pour l’alimentation ou le service de ses bâtiments, ainsi que pour les raccordements aux antennes collectives de radio-television (deux au total).

Dans chaque lot pourront passes des réseaux souterrains utilises au profit de l’un ou l’autre des lots.

Les occupants ne devront au droit de ces réseaux ni construire ni planter de végétations a racines longues susceptibles de les détériorer.

Le ou les propriétaires bénéficiaires de ces canalisations, réseaux et autres conduits seront tenus de remettre en état, a leurs frais, les lots qui auraient eu a subir des dégradations (tranchées par exemple) du fait de la mise en place, de l’entretien ou de la réparation des canalisations, réseaux ou autres conduit ce dessus vises.

The section starts by saying that the lot owners must allow the installation of conduit in their lots for the delivery of services. This includes a common antenna for radio/television. I understand the second paragraph to say that networks are allowed to run through the lots of any owner for the benefit of any of the lot owners. It goes on to say that the owners can't put bushes over the manholes or plant vegetation with long roots that could deteriorate the conduit.

I'm no lawyer but I understand the whole article to say that we should be allowed to run the fiber through all the conduit regardless of whether the lot owners approve or not. I'm not sure why they would actually object to another line in an existing conduit they'll never see. It is also interesting because the common antenna for radio/television isn't in use anymore (although pieces of it remain in the conduit) but some operators are installing a second fiber in their rollouts and using it to broadcast RF radio and television. It could be a way to justify the rollout legally if it ever came down to that.

Friday, February 29, 2008

Breakthrough: Who owns the conduit? - Qui est la proprietaire des fourreux?

I stayed after the FTTH Council Meeting ended to talk to with some vendors about equipment and a friend introduced me to ACOME, a French infrastructure company which does fibre, conduit, etc. They were all getting ready to celebrate the end of the conference - unpacking the champagne from the back room of their stall - but were nice enough to talk with me and give me some advice.

I was interested in the costs of conduit and fibre but the person I spoke with (Arnaud PARIZET) wouldn't discuss anything more than whether there were existing ducts in my residence that I could use and if those ducts still had any sort of pull cables. I pulled out my computer and we took a look at the photos I posted earlier when we opened up one of the boxes.

We couldn't see much on the screen but I left the exhibition thinking that I needed to gather a bit more information. I was also very glad to see the comment from Vincent giving a bit of information about sharing ducts. It means there is still a possibility of using existing ducts and conduit for all the fibre runs - particularly all the way to the exchange which would reduce the EUR 40,000 estimate for that installation.

The breakthrough happened last night when I went home and is thanks to my wife leaving the parking lights on in the car by accident. I noticed them when I walked in the door but forgot to go back out and turn them off. One of the long-time residents drove by, pulled over his car and rang the doorbell to tell us the lights were on. He is the person who helped me open the cover of the box in his driveway to take the picture so I explained where I had been during the day and said I wanted to open up the box again this weekend and take another look to see if there was space.

That's when he said there would be plenty of space because we could simply take out the cabling inside that is no longer used for an old shared antenna in the residence! I hadn't even considered that. Apparently all the houses were connected to one centralized antenna perched somewhere in residence. However, he said that antenna was taken down in 1991 but the cables were all left in the existing conduit - the same one used by France telecom! That's great news for a number of reasons. First, it's not clear to me anymore that the conduit is even France Telecom's to begin with in the residence if there is a second set of cables for the old antenna system inside. That means we may not need permission to put our own fiber in. Second, those cables are no longer used so we could probably pull them out when we install the fiber. In some cases they could probably act as the pull cable as well!

This is great news and I'll go and take a new look inside this weekend and post the results.

Thursday, February 28, 2008

FTTH Council Europe - Notes and advice from equipment manufacturers

I'm here at the FTTH Council Europe meetings in Paris and it has been great because there are all sorts of equipment operators who can answer my questions about the rollout. I've been here with my day job but was able to stop by vendor booths over lunch.
  • The opening session had the CEOs of Free, Neuf/Cegetel and Numericable in addition to the head of Orange's FTTH project. They discussed a lot of issues but at one point someone in the audience asked whether the operators were interested in connecting suburban areas with FTTH. The CEO of Neuf/Celegtel Michel PAULIN was honest and said, "We have no plans to go out there. It's not cost effective". I don't think the operators plan on coming anytime soon.
  • I ran into the CEO of a conduit company (GM PLAST) whom I had met in Iceland a few years ago. We talked for a minute about the project and he mentioned that they may have some conduit I could buy cheaply that they couldn't sell otherwise because it has the wrong printing on it, etc. That's good news considering I don't need much. In speaking with all the conduit providers, microconduit seems to run between EUR 2-5 per meter - depending on a range of factors. That helps give me an idea of costs.
  • I also spoke with Corning Cable Systems and they were very helpful about suggesting the most cost-effective way to rollout for my case. They said that microconduit is the best way to go and that I should connect everyone at the same time. They have solutions that allow operators to quickly add new subscribers but that's not what I'd need. After talking with them I see better how I should connect the fiber within the homes as well.
  • Iit seems as if France Telecom has now made an offers for access to ducts in the previous few weeks. I'll look that up and see if it could apply in our case given we have space in the ducts going through the residence.
  • On the other hand, there is an issue of getting OUT of the box in the driveways and into the homes. I spoke with Radius and they said that drilling out of the box to the house wouldn't be that difficult. That's also good news.
  • KPH talked about something interesting in NL about raising awareness for FTTH. They gave little little flags to people who signed up to put in their lawns. It raised awareness and allowed neighbors to ask why their neighbors hadn't signed up yet. We don't really have fronts lawns but it was an interesting idea.

It has been very interesting and helpful in my planning.