Moment to set up the business / Le moment pour la création de l'entreprise

This evening I spent time talking to a French friend of mine who has a tech-related startup (Mulot Déclic) here in France. We talked about the FTTH project as a whole and about what I would need to do to register the company here in France. He grilled me about how and if this project could be expanded later on. It was a very good exercise to try and convince him that it could work. If I ever do want to expand I'll have to make similar explanations to investors.

One of the key things we discussed was the need to set up a proper business here in France. He assured me that setting one up wasn't as difficult as it is often made out to be. He said that now it was possible to do a lot of it online and that the cost of registering the business should be around EUR 300.

He and his wife are also the brains behind the name for the company. I grabbed the domain name a few months ago and will publish it all as soon as the official business registration goes though. They're both native French speakers and were able to come up with something really catchy.

The Mayor told me I needed a proper business if I wanted to do any street work outside of the residence. It will also make things much more straight-forward when it comes to getting an agreement with our residence association. The only outstanding question is whether I'll need to take on a French partner to register the company - given that I don't have a standard French work permit. I'll look into that.

Wednesday, July 11, 2007

Meeting with Yvelines Numériques / RDV avec Yvelines Numériques

I met up with Jean LEBRET of Yvelines Numériques today in Paris. (For a quick reminder: Yvelines Numeriques is a public/private backhaul network running through our French department). We walked over to a small cafe to talk about the project when French fighter planes cruised right above us in formation - flanking what looked to be a bomber of some sort. It happened three times on the short walk and the jets even left blue and red trails behind them. The whole ground shook as they flew by. Very impressive. We assumed it was practice for Bastille Day coming up.

Once we sat down I explained what I wanted to accomplish with the project and where our residence is located. I may be wrong but I think he was a bit surprised with my determination to see this project through. He jumped right in too saying that he hadn't heard of a similar project yet in France and thought this could actually work in our favor - helping us convince politicians to help me out.

He pulled out his computer and we started going over the maps. It turns out we are very close to their fiber backbone network - but not quite as close as their public map had made it appear. Their network actually dips down a street lower from us, away from the main road, as it comes near the church (and near us). He was able to measure the distance from the edge of the residence to the nearest possible splice point for their network (310 meters). Still not too bad.

He gave me an estimate for how much it will cost to get from our network (in the residence) to his (closer to the exchange): EUR 120 per meter.

310 meters * EUR 120/meter = EUR 37,200

Expensive. He did mention that the prices for the dig could actually be lower (down to EUR 50 per meter) if we were mainly going through fields - which I don't think we would be.

I was a bit taken back with the costs of simply getting to the backhaul but it make me think of some other options, particularly wireless. I'll write about those a bit later.

The main thing I pulled out of our conversation was that he thinks the best way to approach this is by convincing the government to help us get connected to the network. We would essentially ask the village or department to pay for (or subsidize) the connection to Yvelines Numériques as a way for them to save money on connectivity for government offices in the town (e.g. schools, mayor's office, post office). The more he talked about it the more I thought this could be an option. He gave me the names of two people in the Conseil Général to contact who may be able to help. He also suggested I go back to the Mayor and try to convince him to pool the demand for the local government as a way to justify running a fiber between the mayor's office and their network. We could take some strands as the network passed by on the road to the commercial center.

This could be politically attractive option since the Department helped fund half the backbone network and they would have an interest in seeing it lit. Yvelines Numériques only provides the dark fiber so the more cables they can light, the better. I got the impression that the network has much more capacity now than is in use. Out of the 144 fibers in their first cable it sounded like less than 10% were lit in our area. They would definitely have room for us if we could get to them. He also explained that once we'd be in contact with their own fiber the costs would be quite low to go the rest of the way to the exchange (100 meters). They charge EUR 1.80 per meter per year.

Once we made it to the exchange other operators could easily supply us with services since they also have lit fibers on the same backhaul network. The operators may not have their own equipment in the exchange now but it wouldn't be difficult or expensive to simply create a drop point.

Finally, Jean recommended I use PEHD (high density polyethylene in English) for the conduit when I lay it down in the sidewalks. By his calculation I'd need around a kilometer of it and he said the costs wouldn't be too bad.

I was very glad that Yvelines Numériques got back to me and there may be a way to work with them on this. The costs seemed high but I feel at least that this was sign that I can actually make this work.

Monday, July 9, 2007

French civil costs with Vincent MONVILLE / Discussion des coûts civils avec Vincent MONVILLE

I had lunch with Vincent MONVILLE, a French fiber specialist who is a friend of Benoît FELTEN. I met him to talk about general costs and civil works here in France. He's very familiar with providing point-to-point fiber connectivity and clued me in to some of the hurdles I'm going to have to go through. I took notes and even snatched the part of the paper table cloth where he'd drawn some network diagrams.

He broke the network into three geographical parts:

  1. Outside the residence
    This is one of the most complex parts of the civil works to manage bureaucratically. He suggested this is best handled by the operator from whom we eventually purchase connectivity or bring in to provide their own services. In these areas we're also required to dig down the full 60 cm for the trenches.
  2. Public areas of the residence (sidewalks, roads. aggregation point)
    Vincent explained that in a residence I'll probably need to put my request to use the public spaces (and dig the road) to a vote of the residents. That seems natural. I then asked him if I'd need unanimous support from the residents. This could be difficult to obtain after watching some of the debates at the previous association meeting. However, he explained that the process for getting approval is different among associations. In some you only need permission of the "syndic" or president of the association. Others may require a majority vote. Finally, there are some circumstances when we'd have to have all residents in agreement. I'll have to check more on how this works for our own residence. One positive element - we may be able to reduce the depth of the trenches to 15 cm since the residence is private property. That will reduce costs.
  3. Personal property
    Obviously here we'd need permission of every owner before digging in their property. I think most will agree to this, particularly if they're not paying up front. However, there could still be cases where people may decide they don't need fiber and don't want their lawns and gardens touched. This poses a particular problem. In order to attract operators we need to have as many potential clients as possible. Skipping a house with the network (because an owner refuses) will be slightly less costly but also will decrease the incentive for operators. Vincent suggested a work-around here. We could simply put a small drop box in the public portion of the sidewalk in front of their home. As soon as the owner changed his/her mind we could pick up the conduit from there and bring it to the house.

Vincent also explained several steps before the contractors come in and start digging up the road/sidewalk in the residence:

  1. Ask the mayor for a list of network owners
    We need the list of the network owners (electricity, water, sewer, gas, phone, cable) so we can ask them for maps of where their networks are in the area. We'd need to map our own conduit around the existing infrastructure. Vincent explained this was part of a 1991 law I'll have to dig up (so to speak).
  2. Wait four weeks for answers
    The operators have four weeks to answer us with their maps. These will typically come as a PDF or as paper copies.
  3. Present maps and plans to residents
    Once I've mapped out the proposed route for the network I need to present it to the residents. This would show them where we would like to dig in the public areas and on their property.
  4. Notifying existing network owners of the dig
    The company doing the digging has to send a "DICT" to all network owners 10 business days before the work starts. This notifies them that there may be work near their own networks and I assume it allows them to come and ensure their networks remain untouched.

Vincent also gave me a bit of information about the rack I'd need to install and the elements that I'd need to put in it. I'll try to locate this in the public area of the residence which will serve as the aggregation point for the fiber connections.

  • Enclosure: 2m x 60 cm x 60 cm
  • Uninterrupted power supply
  • A fiber entry point
  • The actual switching/termination equipment
  • Batteries

Vincent gave me lots of good advice and suggested I speak next with people who have been doing FTTH projects to see how they would plan out the network. Once I have that information he said he'd be able to give me a better picture of the costs involved.

Friday, June 29, 2007

No single "best practice" / Non seulement un "best practice"

I've had several discussions offline the past 2 weeks with experts who have offered their advice. What I'm starting to understand better is that there is no single "best practice" for putting in a FTTH network. All cases are different and lend themselves to different network topographies, equipment and business plans.

I knew when I started that different housing layouts would require different topologies. What I hadn't counted on was the sheer number of parameters that factor into the decision. It's not like you can just say that you want to run fiber to the home. Will that be PON or end-run? Will the deployment be arial or underground? Even if you narrow that one down you're faced with what type of underground deployment (direct-bury or in conduit, etc). Then you get into questions about what kind of fiber... The list of decisions goes on and on. Luckily I'm getting very good advice from people who want to see more fiber rollouts.

All this leaves me in a bit of a chicken/egg situation. I can't convince people to sign up for the network until I know how much it's going to cost and where it will run. However, I can't easily make many of these decisions regarding the network until I have a feel for their level of interest either (and if they'll let me dig in their yards). It's tough to show up at someone's door and ask them if they're interested if you can't give them details. That's probably exactly what I'm going to have to do though.

Tuesday, June 5, 2007

Possible backhaul problem

I was gathering up information to take with me to my meeting with the mayor this week when I ran across some pricing information for connecting to the fiber backhaul(Yvelines Numeriques). I read through their literature and realize that I may have a problem using their network.

Our Department had the right idea about creating a fiber optic backhaul network that runs throughout our area. We've seen similar rollouts work well all over the world. The government comes in, helps fund the backhaul, and then lets the private sector take over - typically with open access rules.

The only problem here is that they've seemed to have decided ahead of time who they want on the network - and new operators are not part of that group. Their own website states:

FRENCH: Le Conseil Général des Yvelines ne cherche pas à favoriser l’éclosion d’un nouvel opérateur de télécommunications. Il cherche en revanche à attirer les opérateurs existants.

[ENGLISH: The General Council of the Yvelines is not looking to promote the development of a new telecommunication operator. Instead, it is looking to attract existing operators.

Essentially the goal is to bring in existing operators to use France Telecom's existing copper lines to homes - not create new ones.

I believe that this reveals a lack of a longer-term vision when they developed the project. From what I understand they've had trouble attracting the big operators to come and rent capacity to reach the local exchanges. To make matters worse, a French colleague of mine explained that they're locked into the terms of the contract for the 20 years of the "concession".

This seems to be their plan. They built the network mainly to help with local loop unbundling. Operators can lease fiber backhaul to local telecommunication exchanges and then rent copper lines directly to homes from there. The costs are probably too expensive for smaller operators.

They gave some of the pricing on the web. The entry-level price for a fiber strand is EUR 0.70 per meter per year. I initially wanted to run a connection back into Paris but that would be over 20 KM - if they even go that far. I did a few calculations and figured that I'd really need a much larger subscriber base even make the backhaul pay for itself. The minimum cost of taking a fiber from our village towards Paris would be EUR 14,000 per year. We'd have to spread that among a large number of households to make it even start to pay for itself - and that doesn't include the other costs of our own network or transit at the Internet exchange.

I may need to start looking into whether it would be possible to either buy capacity from a larger player or have them come to us.

Monday, June 4, 2007

IP addresses as a barrier to entry / Les adresses IP comme barrière à l'entrée

IP addresses are something I tended to take for granted. However, today I looked into getting a range of IP addresses for the first time and came away from it a bit shocked by the prices. I figure I only need "one class C" set of addresses (254 IP addresses) but it looks as if I have to pay the same registration fee as all other ISPs to ripe.net to be a member for a year. I may have it wrong but it seems as if you have to pay the same price, regardless of size.

RIPE: New Member Information

There is a EUR 2000 sign-up fee and then yearly dues of EUR 1300. Again, the system seems to favor companies with scale, rather than a start-up looking to connect a small number of houses.

I'm debating what to do on the addresses because the feeling is IPv4 addresses will all be gone shortly. It would probably be a wise decision to get some while they're still around.

On the other hand, EUR 3000 would buy a good amount of fiber or conduit. I'm going to hold off on the IP addresses as well until I figure out if I'm going to be running my own ISP or just providing dark fiber to others.

Thursday, May 31, 2007

Bill Woodcock from Packet Clearing House / Bill Woodcock de Packet Clearing House

I was lucky to be at a meeting last week with Bill Woodcock from Packet Clearing House. I don't know of anyone in the world who knows more about Internet traffic exchange and I spent all night at dinner asking him quesitons about the project. I'm an economist - not an engineer - so parts of the discussion went over my head. However, he had some excellent ideas on the network architecture.

His suggestion was to run a 48 strand fibre assembly from the point where we connect into the backbone network back into our own group of houses. He suggested we locate the midpoint in the residence to terminate the fiber connection. From there we could run copper (or fiber) for the last 100 meters to each home and still be capable of gigabit speeds. This would require someone to put the equipment in their basement - or at least at the side of their house.

He also was able to pull together some numbers based on what I said we wanted. Of course we don't know how much it will cost to patch into the backbone network but he figured of the top of his head that we'd be able to put together the network for under EUR 24,000 to reach the 24 homes. I'm going to start looking into the equipment I'd need on the ends of the connections to get a firm idea.

He also told me he has a presentation that Packet Clearing House gives about setting up larger-scale networks but that the same principles would apply to smaller networks. I wrote to him today to ask if he could pass it along.

Wednesday, May 30, 2007

The bad news / La mauvaise nouvelle

We live close to fiber but that doesn't mean that we're going to be able to afford splicing into it. I was at a conference in Paris earlier in the week and spoke with several backhaul carriers who were familiar with the Yvelines Numeriques project. They mentioned that since it was open access and non-discriminatory that meant that I would have to pay as much for a fiber line as a large telco which was unbundling at the exchange. That makes sense to me (from an economic perspective) but does imply that our little residential project may run up against scale economy problems. One possiblity is that we'll be able to make the initial splice and pay for capacity which can then be resold in bits to other neighborhoods in the village which may be interested.

The other bad news could be the road construction. It seems as if several neighbors have been against spending EUR 2000 each to upgrade our roads. I spoke to my wife and she thought the roads were in perfectly good shape and would probably recommend holding off on doing the road work if it were up to her. That could pose a problem - or maybe just end up leaving us another year to work out the details.

The good news / La bonne nouvelle

One of the main reasons I think this project could work is that we live very close to an open-access fibre backbone ring running throughout our French department (Les Yvelines - 78). Our community (residence) within the village has 24 homes, one apartment building and a few commercial shops. At the closest point we're less than 100 meters from the fibre running down the main street of the village and then out to the rest of the department.

From my understanding the fiber ring project, Yvelines Numeriques, was built to provide companies using unbundled local loops a way to connect to local exchanges. We happen to be geographically very close to the network so the civil engineering costs should be quite low to reach the fiber ring.

The other good news is our "residence" will vote next month on whether we should pay to have our roads redone. Our road is private and we're looking at roughly EUR 110,000 to redo it - spread among the residents. If the road work does go ahead then this would be an excellent opportunity to lay the fiber.

There also seems to be a lot of support from people in the neighborhood for such a project. Everyone has trouble with their broadband connections. Our DSL was out for 4 weeks straight in April and others have had similar problems. A few people in our village work in telecommunications and others have jobs that rely heavily on Internet connections. I believe that take-up could be high, particularly among the newer residents.